Cookies Consent

We use cookies to improve your experience. By your continued use of this site you accept such use. For more details, please see our Privacy Policy

Accept
  • Services

    Services

    • Overview
    • Wind Farm Projects
    • Heavy Transport
    • Rigging and Installation
    • Heavy Lifting
    • Logistics Management
    Learn More
  • Case Studies

    Case Studies

    • Overview
    • Heavy Transport
    • Rigging & Installation
    • Heavy Lifting
    • Wind Farm Project
    • Logistics Management
    Learn More
  • Investors

    Investors

    • Fundamentals
    • Financials
      • Monthly Revenue
      • Quarterly Results
      • Financial Reports
    • Shareholder Services
      • Stock Quotes
      • Shareholders' Meeting
      • Dividend
      • TWSE Market Observation Post System
      • Material Information
      • List of Major Shareholders
      • Prospectuses
      • Investor Conference
      • Contacts
    • Corporate Governance
      • Corporate Governance
      • Board of Directors
      • Committees
      • Internal Audit
      • Major Internal Policies
      • Practices
    Learn More
  • ESG

    ESG

    • ESG Report
    • Overview
      • Our Sustainability
      • Messages from the Chairman & President
    • Sustainable Development
      • Corporate Governance
      • Stakeholders
      • Information Security Management
      • Risk Management
      • Ethical Business Practices
    • Sustainable Environment
      • Energy Emission
      • Climate Strategy
    • Friendly Workplace
      • Employee Development
      • Occupational Health & Safety
      • Employee Welfare
      • Labor Rights
    • CSR
    Learn More
  • About Us

    About Us

    • About Us
    • Quality & Safety
    • Leadership
    • Our Stories
    Learn More
  • Press Center
  • Careers

    Careers

    • Life at Giant
    • Learning & Development
    • Join Us
    Learn More
  • Contact
    • English
    • 繁體中文
  • What are you looking for?

External Link Disclaimer

You are about to leave Giant’s website. We have provided this link as a courtesy, but it is no way an endorsement by Giant, and we are responsible for its content. Please understand that when you leave our site, our Privacy Policy is no longer in effect.

Continue Close
GIANT Case Studies Zhong Neng 29 offshore wind power blade transportation operation
Project timeline
Jan-2024 - Jun-2024
Expertise
Wind Farm Project

Zhong Neng 29 offshore wind power blade transportation operation

Zhong Neng received local content plan approval from the Taiwanese government in November 2019 and is one of only two offshore wind projects in Taiwan’s offshore wind history to fulfill the highest localization requirements.
Mammoet-Giant assisted Vestas in transporting a total of 78 offshore wind turbine blades. These blades are 85 meters long and weigh 35 tons. Mammoet-Giant used a Goldhofer multi-axis hydraulic module plate rack with a total of 20 axles and a trailer. The blade was loaded in Tien Li and transported by road at night to Taichung Port #37 Terminal for temporary storage, waiting for the installation ship to be sent to the offshore.

This project is divided into lifting operations and transportation operations:
Lifting operations: According to the drawing, use 80-ton and 100-ton cranes that meet the specifications to hang the head and tail ends of the blades respectively. Use a cherrypicker to hook up the spreader at the hanging point. The team directs the trailer to push Goldhofer and stop under the blade. At place the blade on the Goldhofer and lash it stable. Transportation operations: According to the night transportation planning schedule. During the operation, in addition to Goldhofer operators and front and rear guide vehicles to transport and escort the blades, there are also traffic control personnel at major intersections to clear the roads, so that the blades can reach their destination smoothly under the highest safety environment.
According to various weather and difficult road conditions, our team works together to adjust the work content, so that the blades can be delivered smoothly on the schedule arranged by the owner. "

Related case studies

See all case studies
  • Yunlin OWF marshalling yard storage and transportation comprehensive transportation plan
    NOV 08, 2024
    Wind Farm Project

    Yunlin OWF marshalling yard storage and transportation comprehensive transportation plan

    read more
  • Jacket foundation and pin pile production line transportation operations of Changfang and Xidao Offshore Wind Farms
    MAY 30, 2024
    Wind Farm Project

    Jacket foundation and pin pile production line transportation operations of Changfang and Xidao Offshore Wind Farms

    read more
  • Wind farm construction logistics integration: Submarine cable transportation and installation
    MAY 30, 2024
    Wind Farm Project

    Wind farm construction logistics integration: Submarine cable transportation and installation

    read more

9F.-2, No. 21, Huanke 1st Rd., Zhubei City, Hsinchu County 302047 , Taiwan (R.O.C.)

Sitemap
  • Services
  • Case Studies
  • Investors
  • ESG
  • About Us
  • Press Center
  • Careers
  • Contact Us
Contact information
  • +886-3-559-1177
  • +886-3-559-1222
  • info@jia-yun.com.tw
Sitemap Terms of Use Privacy Policy