PROJECTS

SPECIAL CASE NAME

Transportation, Barging and Rigging Ming Rong Yuan R-2001 reactor of Dalin Po Plant/CPC Corporation, Taiwan

ENGINEERING TIME

2016.02.18~2016.02.21

ENGINEERING OUTLINE

R-2001 hydrodesulfurization reactor L40.462m * W5.875m * H6.09m / 596t, transported from Kaohsiung Harbor No. 75 to CNPC Dahlin Refinery No. 11 Diesel Hydrodesulfurization Plant by barge and dollys. Which be lifted to install by crane Installed on base base.